PS: Responsible (R) Approval (A) Support (S) Inform (I) Consult ( C)
Category Service item Customer responsibilities FastCTC responsibilities
Project management Project Milestones R A
Project planning and execution A/S R
Project budgeting for reference A R
Project review by stage A/S R
Design review by stage R or A A or R
Monthly actual spending vs. budget plan review A R
Monthly Unit cost review A R
Identify, quantify and escalate project risks I R
Identify potential contract manufacturer I R
Review and sign Manufacturing service agreement with CM A R
Build plan creation and update A R
Engineering sample build coordination I R
Engineering verification build coordination I R
Design validation build coordination I R
Production validation build coordination I R
Production sustaining A R
Customer specific DOE coordination I R
System Design product definition R A
ME Industry design R or A S or R
Color/material/Finish definition R or A S or R
3D CAD file creation and update R or I A or R
2D drawing creation and update R or I A or R
BOM creation and update R or I A or R
Tolerance analysis I R
EE Electrical schematic creation and update R or I A or R
ECAD library creation and update for all EE parts I R
Electrical layout creation and update I R
Electrical BOM creation and update R or I A or R
Panel drawing creation and update I R
RF/antenna design and improvement I R
Electrical design verification I R
EE debugging/troubleshooting I R
Manufacturing build support I R
Failure analysis/root cause/corrective actions I R
Acoustic Acoustic solution recommendation R or I A or R
Acoustic component selection and verification R or I A or R
Tailor the work of Mechanical and Acoustic I R
Optic Optical solution recommendation R or I A or R
Optical component selection and verification R or I A or R
Tailor the work of Mechanical and Optic I R
Validation & Certification Unique reliability test equipment/fixture definition I R
Unique reliability test equipment/fixture quotation A R
Product reliability test plan I R
Product reliability test plan quotation A R
Product reliability test execution I R
Product safety and certification test plan I R
Product safety and certification test quotation A R
Product safety and certification test execution I R
Product compliance test plan I R
Product compliance test plan quotation A R
Product compliance test execution I R
FATP Final assembly, Test&Pack process development I R
Line capacity calculation I R
Manufacturing test plan I R
Unique test equipment selection I R
Manufacturing test solution quotation
-Hardware fabrication-optional
-Script development-optional
-Hardware and Script integration and debugging-optional
-System solution(hardware, software and integration)-optional
A R
Manufacturing test station fabrication supervising I R
Manufacturing test station installing and debugging I R
Manufacturing test station Qualification(Cpk and GR&R) I R
Manufacturing DFM review I R
Unique assembly equipment selection I R
Assembling tolerance analysis report I R
Manufacturing assembly&fixture equipment quotation A R
Manufacturing assembly fixture fabrication supervising I R
Manufacturing assembly station installing and debugging I R
Manufacturing assembly station qualification(Cpk and GR&R) I R
Package design R or I A or R
Packing vendor selection A R
Packing fixture quotation A R
Packing fixture fabrication supervising I R
Packing fixture installing and debugging I R
Packing line qualification I R
Quality Quality plan creation and update I R
Cosmetic inspection criterion creation and update I R
CMF approval I R
Quality control I R
Yield rate reporting I R
Open issue tracking I R
Tooling & Molding Tooling capacity calculation A R
Tooling quotation A R
Tooling DFM review I R
Tooling fabrication supervising I R
Manufacturing test station Qualification(Cpk and GR&R) I R
Tooling fabrication tracking/modification review I R
Molding supervising I R
SQE New supplier qualification I R
Supplier quality management I R
Tooled parts qualification(First article inspection and Cpk) I R
Supply Chain Supplier development
-Work with supplier base to validate those suppliers have high confidence capability to produce components with required features and quality throughout the product lifecycle
I R
Purchasing I R
Ramp up plan creation and update A R
Production execution supervising A R
Support Generate MES(Manufacturing execution system) solution I R
MES system quotation A R
MES system installing and debugging I R
MES system qualification I R
Design change record and execution R or I S or R
BOM and drawing revision control R or I S or R
Logistic solution A R